top of page

DS 207/1 - Al Awir First Sewerage and Stormwater System

c837a6_1afd3c268e484861ad807bb1fe0d5848~mv2.jpg

Project Specifications

LOCATION

Al Awir, Dubai UAE.

CLIENT

Dubai Municipality

CONTRACT VALUE

36,273,247.38 (AED)

STATUS:

COMPLETED

Scope

Installation of Sewer Network Pipeline 8km diameter 160mm-1000mm, depth from 1.5m-8m and Storm Water Pipeline 7.5km diameter 200mm - 1800mm, depth from 1.5m-7.5m.

Excavation, Installation, Testing and Backfilling for House Connection, Sewer and Storm Water.

bottom of page