top of page
DS 207/1 - Al Awir First Sewerage and Stormwater System

Project Specifications
LOCATION
Al Awir, Dubai UAE.
CLIENT
Dubai Municipality
CONTRACT VALUE
36,273,247.38 (AED)
STATUS:
COMPLETED
Scope
Installation of Sewer Network Pipeline 8km diameter 160mm-1000mm, depth from 1.5m-8m and Storm Water Pipeline 7.5km diameter 200mm - 1800mm, depth from 1.5m-7.5m.
Excavation, Installation, Testing and Backfilling for House Connection, Sewer and Storm Water.

bottom of page



